Project Description
Supply, installation, configuration, testing, and commissioning of VMware vSphere Standard 8 environment along with Windows Server and Microsoft Office installation and configuration at the project site in Ar Rass.
The project includes virtualization platform deployment, server setup, operating system installation, user configuration, network integration, software activation, system optimization, testing, and final commissioning to ensure stable and efficient IT infrastructure operation.
Scope of Work
VMware vSphere Standard 8 deployment
Windows Server installation
Microsoft Office setup and activation
User and network configuration
System optimization and final commissioning